No backdrop available
Poster for Ultimate Tanker

Ultimate Tanker

2010
  • 1h
  • January 1, 2010 · Netherlands

Overview

The world is running out of oil, but one mega-tanker could unlock the planets last reserves. Enter the FPSO, a Floating, Processing, Storage and Offloading vessel - a high tech floating rig, designed to extract deep-sea oil from waters too dangerous for traditional oil rigs. The FPSO is also the ultimate recycling project. This film follows the extreme makeover of the Pioneer, a rusty 17 year-old tanker as it gets converted into a state-of-the-art FPSO. If the makeover succeeds, Pioneer will be the first ever FPSO in American waters and will tap oil wells that lie at a record breaking 2.6km under the sea.

Details

Status
Released
Release date
January 1, 2010
Original language
English
Spoken languages
English
Countries
Netherlands
Production
Off the Fence
Budget
Not recorded
Revenue
Not recorded
Ultimate Tanker (2010) | Kinocult